National Convention & Exhibition Center (Tianjin)

Project Information:

Project Date:September 2019

Project Location:Tianjin

Project Name: National Convention & Exhibition Center (Tianjin)

Project Solution:300 scissor lifts and 80 boom lifts

Introduction:
The National Convention and Exhibition Center (Tianjin) project, as a national-level model of intelligent green buildings, has a three-star green building design label. With a focus on green, energy-saving and smart construction, the entire venue adopted prefabricated construction, widely applied eco-friendly materials, designed sponge functions with great care, and effectively used renewable energy. There is a large proportion of electric series in CDHorizon’s product line of aerial work platforms. The large-load, 30-meter electric boom lifts provided for the project can greatly improve construction efficiency while saving energy and reducing emissions. During the construction period, CDHorizon and China Construction Eighth Engineering Division jointly launched an “Aerial Work Platform Safety Operation Training” activity at the National Convention and Exhibition Center (Tianjin) to strengthen aerial work practices, simulating how to respond quickly and deal with risks during the construction process, such as falling from height, equipment tip-over, electric shock, and collision. At the same time, CDHorizon’s service personnel regularly conducted aerial work equipment inspection and maintenance, stayed at the front line of the project’s operations, kept safety education in mind and put safety awareness into action, so as to ensure the safe construction of the project.
  • Follow Us

  • Video

  • Tiktok

Copyright 2022 HCDHORIZONB All Rights Reserved Shanghai public network security:31011502009437 ICP:19002473-1