Beijing Xiaotangshan

Project Information:

Project Date: February 2020

Project Location:Beijing

Project Name:Beijing Xiaotangshan

Project Solution:50 hydraulic aerial cages

Introduction:
Xiaotangshan, Changping, Beijing. Building height: 15m on the average, main uses: With facade construction of the prefabricated houses and the hospital wards, Xiaotangshan Hospital Reconstruction Project is a key project for strategic reservation and epidemic prevention and control.
  • Follow Us

  • Video

  • Tiktok

Copyright 2022 HCDHORIZONB All Rights Reserved Shanghai public network security:31011502009437 ICP:19002473-1